成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓
當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
PMP美國(guó)項(xiàng)目管理模擬題精選8
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
Qustions 1:The output of scope change control consists of--
a. Scope changes, corrective action, and lessons learned
b. Corrective action, scope changes, and project plan updates
c. Performance measurement, additional planning, and lessons learned
d. Work results, product documentation, and formal acceptance
Qustions 3:
The scope statement--
a. Dose not include project objectives such as cost, schedule, or quality measures
b. Includes a description of project assumptions and constraints
c. Provides a documented basis for preparing the PERT/CPM network
d. Describes how the WBS will be structured
Qustions 5:
To relate the functional organizations to the WBS elements, the project manager should use a--
a. WBS index
b. Project WBS
c. Cost account matrix
d. Work package assignment idex
Qustions 2:
All the following are project selection methods except--
a. Logical Framework analysis
b. Analytic Hierarchy process
c. Expert judgment
d. Decision trees
Qustions 4:
The project charter should be issued by--
a. The project manager
b. The head of the performing organization
c. A manager external to the project
d. The project sponsor
Qustions 6:
Completion of project scope activities is measured against the --
a. Requirements
b. Project plan
c. Scope management plan
d. WBS
本站推薦
- 1工程甲方管理考什么證 pmp
- 2信息系統(tǒng)監(jiān)理工程師可以考pmp
- 3pmp與信息系統(tǒng)監(jiān)理工程師
- 4pmp項(xiàng)目管理甲方需求變更
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 6項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 7PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問終結(jié)者,您還在等什么?
- 8項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 9PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!

